Construction

Software for contractors and construction operators

Contractors need a job record that survives the site and the office: variations, subcontractors, daily reports, and the cost that is no longer a surprise at the end. We build that operational system rather than a generic task list.

  • Project cost visibility
  • Subcontractor workflow
  • Site reporting
  • Drawing and document register

Site and office are one project

A daily report that never reaches the cost code is a diary, not a control. We connect the site capture, often on a phone, to the project and the approval that releases money. Photos and documents stay with the event that produced them.

What the first release usually is

One type of project, one reporting loop, and the variation or subcontract approval that currently happens in email. A full estimation suite is a later decision, especially if you already own one that people trust.

The project the site can update

On the first project

  • The package or the site report
  • Who approves a change
  • Photos and notes the office can find

A programme

  • Every subcontractor portal
  • A full cost-control suite
  • BIM as a slogan with no file you use

What changes construction software

01

The site

If it needs a desk and a strong signal, the foreman will not open it.

02

The change

A variation needs an owner and a cost effect, or it is only a chat message.

03

The drawing

Say which file is current. A folder of versions is not a system.

What a site brief needs

  1. 01

    The project

    One live job, not the whole portfolio.

  2. 02

    The site

    Signal, dust, and who will actually type.

  3. 03

    The change

    How a variation is approved, and whether cost is in scope.

  4. 04

    The current file

    Which drawing is the one people should open.

Marks a job cost is current

  1. 01

    A variation is approved

    Extra work is on the job only after the person who may say yes has said it.

  2. 02

    A drawing has a revision

    The site is looking at the revision that was issued, not an older file with the same name.

  3. 03

    An update is dated

    A progress note says who wrote it and which day it describes.

  4. 04

    Cost sits on the job

    Labour, material, and variation land on that project.

What we build

Project cost visibility

Commitments and actuals at a level a project manager can use weekly.

Subcontractor workflow

Packages, certificates, and the documents required before payment.

Site reporting

A phone-friendly report that lands on the job, including photos.

Drawing and document register

Which revision is current, and who was told.

Questions we hear

Can site staff use this with poor signal?

Yes if we design an offline queue for the reports that matter. See mobile development for how we treat sync.

Do you build BIM tools?

We integrate with files and registers. We are not a geometry kernel or a BIM authoring vendor.

Will this handle retention and variations?

Yes, when those rules are specified by your commercial team. We implement the workflow they define. We do not replace a quantity surveyor’s judgement.